J

Jay Kwak

3 years ago

I ve lived an apartment about 7 months under FPI M...

I ve lived an apartment about 7 months under FPI Management.

What FPI management is doing for tenant? What condition is livable for tenant?

Recently, my unit got water damaged and manager requested to vacate my unit for construction due water was falling from ceiling and over flowering from sink and damaged whole unit expect one bedroom.

They needed construction for whole kitchen and living room and master bedroom include wall, ceiling, and flooring and more.

FPI gave my back such as conditions below on 9/16

1. Kitchen sink was leaking

2. Dishwasher waste thru air gap and made another flood countertop

3. Counter top was dirty and tile didn t install properly because they kept existing tile to use.

4. Microwave didn t work

5. They took out shelving for some base kitchen counter but they didn t install back

6. Beyond kitchen cabinet wall didn t patch and left huge gaps

7. They left a lot of dust in whole unit such as power of gypsum board and it was very hard to breath.

8. They didn t finish some wall, electric outlet, and base molding

9. They left water damaged closet cabinet

10. And so on (If you need more detail, I can share all pictures on website)

On 9/16, I walked thru with property assist manger and inform to her.

On 9/20, I got call from property manager and her first saying was when I will pay for rent.

On 9/22, property manager came to unit and I walked thru with her again. She told me that they will re-construction for new tenant when my leasing is over. Even she agrees that was unprofessional job.

On 9/23, they repaired for major things such as dishwasher, wall, countertop and so on.

I still remember first date of seeing this unit. It wasn t all new but was well maintained.

But they returned me different condition and It was completed on 9/25 for major things. They said that they provided me livable condition so I had to pay from 9/16. I claimed a lot and they offered me another $250 off for 4 days. (my rent is $1999/month). Do I have to pay rent for uncompleted job?

I ve contacted your office and they gave me regional manager or supervisor contact inform. But I couldn t contact him.

Now my kitchen sink is still leaking and I got call about 3 days notice if I can t pay whatever they offered.

Per your understanding, I ll share pictures what condition was on 9/16, 9/25

Please teach me what is livable condition and how FPI charge rent for tenant what FPI support for tenant.

Comments:

No comments