This company was hired to remove existing flooring...

This company was hired to remove existing flooring and replace with new flooring in a condo unit. They began to remove the flooring and ended up pulling up all the subflooring and cement. They did not stop work when realizing that it was destroying my property only to continue ripping up the subflooring. After they completed pulling up the floors I was notified that this problem occurred and needed to repair the subflooring. my cost then doubled to repair and replace the subflooring. They were no longer able to use the original product that I chose because they were not able to make the subflooring perfectly level therefore I had to pay extra for the new type of flooring that they had to use. 430 square feet of vinyl flooring for $4,000.00... .