B

Bruce Konkel

4 years ago

Jayme came for the initial quote and to measure fo...

Jayme came for the initial quote and to measure for beams. The day of the install, I was told they'd be here morning to mid morning. They showed up about 3:oo pm and said their previous job ran long. They came in through the back door, which was the shortest way into the basement. They laid down floor protection material from the back door all the way to the unfinished portion of the basement. They passed the beams thru a basement window. (2) bricks had shifted around a window. They dug out the soil around the window by hand, and reset those bricks. I can not tell that they even did any work outside as they did a great job of cleaning up. They stayed until the job was complete, about 7:30 pm. Joe and his crew worked very hard and I'm very happy with the result.

Comments:

No comments