Got less asphalt than what they estimated.
They sent a representative over to my house to measure and calculate the amount of asphalt it would require for my driveway. He calculated it and showed me that it would take 74.11764 tons at 85 square feet per ton. They did all of the preliminary work, milling out places that need to be milled, burnt out all the grass in crakes and removed the grass around the driveway. Put down 3 truckloads of asphalt and at the time I thought there was 25 tons on each truck but later found out their trucks could only haul 20 tons each legally, so they only put down approximately 60 tons. My driveway is a huge improvement from what it was before but would have been even better is they had put down the addition 15 tons I paid for. I chose them because they included the tact coat and I thought I was getting 10 tons additional asphalt that the first company estimated. I really thought they would be a trustworthy company.